{"id":1802,"date":"2014-06-02T14:14:06","date_gmt":"2014-06-02T14:14:06","guid":{"rendered":"https:\/\/pveurosolution.com\/?post_type=case-study&#038;p=1802"},"modified":"2023-06-05T13:55:44","modified_gmt":"2023-06-05T13:55:44","slug":"jasper","status":"publish","type":"case-study","link":"https:\/\/pveurosolution.com\/eng\/case-study\/jasper\/","title":{"rendered":"Jasper project: one of Africa's largest solar power plants"},"content":{"rendered":"<p>Amid the endless expanses of land that characterize the African territory, a project arises that not only aims to improve the conditions of the population, but directly involves local resources for awareness and training.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/pveurosolution.com\/wp-content\/uploads\/2023\/06\/20141010-240D3202-1-1024x683.jpg\" alt=\"\" class=\"wp-image-1803\" srcset=\"https:\/\/pveurosolution.com\/wp-content\/uploads\/2023\/06\/20141010-240D3202-1-1024x683.jpg 1024w, https:\/\/pveurosolution.com\/wp-content\/uploads\/2023\/06\/20141010-240D3202-1-300x200.jpg 300w, https:\/\/pveurosolution.com\/wp-content\/uploads\/2023\/06\/20141010-240D3202-1-768x512.jpg 768w, https:\/\/pveurosolution.com\/wp-content\/uploads\/2023\/06\/20141010-240D3202-1-18x12.jpg 18w, https:\/\/pveurosolution.com\/wp-content\/uploads\/2023\/06\/20141010-240D3202-1-200x133.jpg 200w, https:\/\/pveurosolution.com\/wp-content\/uploads\/2023\/06\/20141010-240D3202-1.jpg 1128w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Sustainability of the project and its impact for the communities in the area<\/h3>\n\n\n\n<p>The Jasper Solar Project, located in Postmasburg in the Northern Cape region of South Africa, represents one of the largest solar power plants in Africa. This ground-mounted solar power plant, built in 2014, boasts a capacity of <strong>96 MWp<\/strong> and makes a strong contribution to clean energy generation in the country.\u00a0 <\/p>\n\n\n\n<p>Since it began full commercial operations in October 2014, the plant has played a key role in meeting the electrical needs of some <strong>80,000 homes<\/strong>, while significantly reducing carbon dioxide emissions<strong> by as much as 145,891 tons per year. <\/strong>With its impressive annual generation of 180 GWh of clean, renewable energy, the Jasper project has had a significant impact on the region's energy supply.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/pveurosolution.com\/wp-content\/uploads\/2023\/06\/2-1024x576.jpg\" alt=\"\" class=\"wp-image-1804\" srcset=\"https:\/\/pveurosolution.com\/wp-content\/uploads\/2023\/06\/2-1024x576.jpg 1024w, https:\/\/pveurosolution.com\/wp-content\/uploads\/2023\/06\/2-300x169.jpg 300w, https:\/\/pveurosolution.com\/wp-content\/uploads\/2023\/06\/2-768x432.jpg 768w, https:\/\/pveurosolution.com\/wp-content\/uploads\/2023\/06\/2-18x10.jpg 18w, https:\/\/pveurosolution.com\/wp-content\/uploads\/2023\/06\/2-200x113.jpg 200w, https:\/\/pveurosolution.com\/wp-content\/uploads\/2023\/06\/2.jpg 1032w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">PV Eurosolution's contribution<\/h3>\n\n\n\n<p>PV Eurosolution played a crucial role in the implementation of the plant. The team, composed of experts with expertise in various areas, was responsible for installing the support structures, assembling the modules, and <strong>training more than 300 people to enhance the local workforce<\/strong>.<\/p>\n\n\n\n<p>The project represents PV Eurosolution's commitment to renewable energy, helping to create a better future through clean and sustainable energy production.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"789\" height=\"571\" src=\"https:\/\/pveurosolution.com\/wp-content\/uploads\/2023\/06\/20141010-240D3245.jpg\" alt=\"\" class=\"wp-image-1805\" srcset=\"https:\/\/pveurosolution.com\/wp-content\/uploads\/2023\/06\/20141010-240D3245.jpg 789w, https:\/\/pveurosolution.com\/wp-content\/uploads\/2023\/06\/20141010-240D3245-300x217.jpg 300w, https:\/\/pveurosolution.com\/wp-content\/uploads\/2023\/06\/20141010-240D3245-768x556.jpg 768w, https:\/\/pveurosolution.com\/wp-content\/uploads\/2023\/06\/20141010-240D3245-18x12.jpg 18w, https:\/\/pveurosolution.com\/wp-content\/uploads\/2023\/06\/20141010-240D3245-200x145.jpg 200w\" sizes=\"(max-width: 789px) 100vw, 789px\" \/><\/figure>","protected":false},"featured_media":1803,"template":"","meta":{"_acf_changed":false},"categories":[],"class_list":["post-1802","case-study","type-case-study","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/pveurosolution.com\/eng\/wp-json\/wp\/v2\/case-study\/1802","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pveurosolution.com\/eng\/wp-json\/wp\/v2\/case-study"}],"about":[{"href":"https:\/\/pveurosolution.com\/eng\/wp-json\/wp\/v2\/types\/case-study"}],"version-history":[{"count":6,"href":"https:\/\/pveurosolution.com\/eng\/wp-json\/wp\/v2\/case-study\/1802\/revisions"}],"predecessor-version":[{"id":1883,"href":"https:\/\/pveurosolution.com\/eng\/wp-json\/wp\/v2\/case-study\/1802\/revisions\/1883"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pveurosolution.com\/eng\/wp-json\/wp\/v2\/media\/1803"}],"wp:attachment":[{"href":"https:\/\/pveurosolution.com\/eng\/wp-json\/wp\/v2\/media?parent=1802"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pveurosolution.com\/eng\/wp-json\/wp\/v2\/categories?post=1802"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}